Application of economical and mathematical methods to manage projects
Abstract
Introduction. The deadline for the planned works in the project is one of the critical parameters that are not mostly approached. In addition, non-compliance with the deadline usually leads to an increase in the cost of the project. It can be the failure in fulfilling another critical parameter of the projects. One of the reasons of this problem is the non-optimal appointment of job executors.
Purpose. The article aims to develop an economics and mathematical model for optimal selection of project executors under uncertainty.
Results. In order to achieve the goal of the work, factors, which influence its scheduled completion, existing models of executors’ optimal selection are analysed. The unsolved parts of the problem are identified. Executors’ selection criteria and significant limitations of the model are analysed. It has been concluded that one of the most critical factors is the uncertainty of the executors’ production capacities at the time of their carrying out (the number of free technics or workers who will be free and may be involved in future work). The proposed model allows choosing the optimal executors not only under the term’s criteria, but also under taking into account the total cost of the planned works. It can also be used by enterprises and organizations that involve a subcontractor to perform certain work.
Keywords
References
Katayev A. V., Katayeva T. M., Makarova E. L. (2016). Project Management: Mathematical Models of Optimal Executors’ Appointment for Project Works. Izvestiya of Saratov university. Series: Economics. Management. Law, 16 (3), 294-299.
Voropayev, V. I., Gel’rud, Ya. D. (2012). Mathematical models for project management stakeholders. Project management, 4 (32), 258‒269.
Crowston W. B. (1970). Models for project management. Cambridge, Sloan Mngm.
Kelley E. James (1961). Critical-Path Planning and Scheduling: Mathematical Basis. Oper. Res., 9, 96-320.
Valadares L. Tavares (1999). Advanced Models for Project Management. Lisbon. 1999.
Zaychenko, Yuriy & Sydoruk, Inna. (2012). Optimization of the Fuzzy Investment Portfolio under Conditions of Uncertainty. Naukovi pratsi Odeskoi natsionalnoi akademii kharchovykh tekhnolohii, 42(1), 310-315.
DOI: http://dx.doi.org/10.35774/econa2018.04.253
Article Metrics
Metrics powered by PLOS ALM
Refbacks
- There are currently no refbacks.
Copyright (c)
Articles are distributed under Creative Commons Attribution International 4.0 (CC-BY-NC 4.0)
Science Works Journal "Ekonomichnyy analiz"
ISSN 1993-0259 (Print) ISSN 2219-4649 (Online) DOI: 10.35774/econa
© West Ukrainian National University
© «Ekonomichnyy analiz», 2007-2023